Solar-G, a division of G-Mac Electric, inc., is an environmentally responsible company that combines the experience and expertise of over 25 years of electrical and solar solutions. The main goal of Solar-G is to leave a positive, lasting impression on all of our customers. We strive to excel in what we do, and we accomplish the time and time again by not only producing an exceptional product, but by consistently delivering that product with both integrity and reliability.
The majority of our staff has been with us for over 100 years and executes every job with high quality workmanship. We pride ourselves on our finely tuned teams that care about their work, do it well and do it on time. No client should expect anything less.
We are located in Los Angeles county, but handle projects throughout the state of California and across the United States.
Our team experience ranges from residential, commercial and industrial to field, campus and carport. We specialize in solar systems of 100 watts to 100 kilowatts output, and provide:
- Utility interconnection with renewable energy
- Large scale, uninterrupted power connection
- Power quality enhancement
- Off-grid renewable energy systems design and installation
- Whole systems integration
- Power consumption evaluation
- Electrical efficiency analysis and retrofit
Our team includes experts at designing and installing solar systems – both off-grid and line inter tie systems to utility. Solar-G uses only proven technology and system design, while offering information, products and service of the highest quality. The Solar-G team has the expertise to do the job right the first time, and welcomes the opportunity to design, plan and install entire systems.
Solar-G is proud to offer clients the highest quality service that provides the best solar environmental advantages, for the lowest possible cost.
Solar-G Managing Experience:
College Carport – Los Angeles, CA
DC Wattage size 1.1 mw.
Solar panels were installed on rooftop to create carport.
Project duration – 4 months.
LA MTA Project
DC Wattage size 2 mw.
Various racking systems installed: Carport, Sun Link roof mount, S-5 clip mount on a pitched roof.
Project duration – 6 months.
Ground Mount System – CA
DC Wattage size 1.2 mw.
Sun Link ground mount racking system installed above campus grounds.
Including all High Voltage interconnections for Solar Array.
Advanced Energy bipolar inverters installed.
Project duration – 3 months.
Distribution Facilities – Oxnard, CA
DC Wattage size 1.3 mw.
Rooftop mount system using module racking and First Solar modules.
Advanced energy inverters.
Project duration – 2 months. (Accelerated work schedule)
Retail Stores – throughout CA
DC Wattage size 6 mw.
13 different stores throughout Southern California.
All roof top mounted systems using Sun Link module racking system.
Xantrex Inverters.
Project duration – 6 months.
Unified School District – CA
DC Wattage size 2 mw.
Various schools throughout the S.J.U.S.D. area. Carport and rooftop mount systems.
Project duration – 8 months.
Custom Residential – Rolling Hills, CA
DC wattage size 2.5kw
Enphase Micro inverters installed.
Enphase individual panel monitoring system installed.
Project duration – 2 weeks.